Dashboard
Good morning, Project Manager.
Project Alpha is 67% complete. FIDIC exposure: past the 21-day mark. 0 items need your decision: , , with consultant. Receivables awaiting client release.
This is THE one thing that has to happen today. L14 S-S-3 pour - 38 workers, C45 mix, 320m³. Miss the 11:00 window and you slip into heat-stop, losing the day. All gates currently green. Concrete is en route.
L14 slab pour · S-S-3
AED 1.8B across 7 active projects. Three are in MEP fit-out, two in superstructure, one in foundations, one in handover. Marina Heights is your biggest at AED 580M.
Engineer's IPC turnaround dropped to 21d this quarter (was 26d). Still 2d above the FIDIC 14d target. Slowest: Consultant Architects A at 28d. Contract allows acceleration incentives - want a draft?
Worst project is 0d behind baseline - up 8d this month. Saadiyat Cultural Hotel. Two stalled RFIs on cladding submittals drive 60% of the gap. Clear one and slip drops to ~18d.
0 open defects across the portfolio. Closing pace is good - down 12 this week. 9 are critical-severity (3 on Project Beta L4 MEP). Want me to schedule a joint walk?
Today: 8 scheduled activities. Critical activity: L14 slab pour 07:00→11:00. The 09:30 L13 rebar inspection MUST clear for the pour to start on time. If it slips, we lose the pour to the 12:30 heat-stop. Want a 10-min reminder before the inspection?
1 items sorted by urgency. Most pressing: 0 EOT-exposed RFIs. Suggest a 30-min afternoon block to address them as a package rather than one-at-a-time.
Four signals
Portfolio sits at 0.0% - 0.7pp behind plan. But that's an aggregate. Project Beta is -22pp pulling us down; Project Zeta is in handover pushing us up. The spread between them is widening.
Claims have quadrupled in 6 months while payments plateaued. The gap - AED 51M sitting between engineer-review and certified-but-unpaid. May's AED 80M claim is the second-largest on record. I'd send a chaser on IPC #7 today.
Distribution is bimodal - 0 fresh RFIs (under 14d) and 0 stuck past the FIDIC threshold. The stuck cluster is all DEWA hold-point queries on Project Alpha. Suggest escalating as a single package rather than one-by-one.
Concrete crew peaked 8 days ago and is winding down. MEP ramping up — bring on the finishing trades next week. Excavation crew demob is complete. Today's mix is normal for week 26 of the programme.