Swyfl.it· Sample data only
Talk to us about a custom build
Contact
C
ConstructOps
Workspace
Lifecycle
Commercial
People
Correspondence
Field
Compliance
Workspace›

Dashboard

⌘ K
Sat 11 Jul·
37°C · 62%·
Heat-stop 4h 22m·
412 on site·
14 active PTWs·
0 incidents today·
Wind 14 km/h
م
Mu'tamad brief · this morning
04:36

Good morning, Project Manager.

Project Alpha is 67% complete. FIDIC exposure: past the 21-day mark. 0 items need your decision: , , with consultant. Receivables awaiting client release.

Today's critical activity
مMu'tamad reads this as

This is THE one thing that has to happen today. L14 S-S-3 pour - 38 workers, C45 mix, 320m³. Miss the 11:00 window and you slip into heat-stop, losing the day. All gates currently green. Concrete is en route.

L14 slab pour · S-S-3

07:00 → 11:00·38 workers
Weather:OK
Pour card:Signed
Rebar inspection:Passed
PTW status:Active
Portfolio
مMu'tamad reads this as

AED 1.8B across 7 active projects. Three are in MEP fit-out, two in superstructure, one in foundations, one in handover. Marina Heights is your biggest at AED 580M.

Cert. velocity
مMu'tamad reads this as

Engineer's IPC turnaround dropped to 21d this quarter (was 26d). Still 2d above the FIDIC 14d target. Slowest: Consultant Architects A at 28d. Contract allows acceleration incentives - want a draft?

Schedule slip
مMu'tamad reads this as

Worst project is 0d behind baseline - up 8d this month. Saadiyat Cultural Hotel. Two stalled RFIs on cladding submittals drive 60% of the gap. Clear one and slip drops to ~18d.

Defects open
مMu'tamad reads this as

0 open defects across the portfolio. Closing pace is good - down 12 this week. 9 are critical-severity (3 on Project Beta L4 MEP). Want me to schedule a joint walk?

Today · 06:00 → 18:00
Activity Inspection Delivery
مMu'tamad reads this as

Today: 8 scheduled activities. Critical activity: L14 slab pour 07:00→11:00. The 09:30 L13 rebar inspection MUST clear for the pour to start on time. If it slips, we lose the pour to the 12:30 heat-stop. Want a 10-min reminder before the inspection?

HEAT-STOP 12:30 → 15:00
06
07
08
09
10
11
12
13
14
15
16
17
18
L14 slab pour S-S-3
T20 rebar delivery
L13 rebar inspection
Consultant meeting
Lunch break
L12 MEP install
HSE walk-through
C45 concrete delivery
On your desk
1 items
مMu'tamad reads this as

1 items sorted by urgency. Most pressing: 0 EOT-exposed RFIs. Suggest a 30-min afternoon block to address them as a package rather than one-at-a-time.

Project health

Four signals

مReceivables velocity slowed 14%. Likely the consultant's backlog on IPC #7.
S-curve
Planned vs actual
مMu'tamad reads this as

Portfolio sits at 0.0% - 0.7pp behind plan. But that's an aggregate. Project Beta is -22pp pulling us down; Project Zeta is in handover pushing us up. The spread between them is widening.

0.0%↓ 0.7 pp
Cashflow
AED M · last 6 mo
مMu'tamad reads this as

Claims have quadrupled in 6 months while payments plateaued. The gap - AED 51M sitting between engineer-review and certified-but-unpaid. May's AED 80M claim is the second-largest on record. I'd send a chaser on IPC #7 today.

AED 80Mclaimed this month
Dec
Jan
Feb
Mar
Apr
May
Claimed Certified Paid
RFI aging
0 open
مMu'tamad reads this as

Distribution is bimodal - 0 fresh RFIs (under 14d) and 0 stuck past the FIDIC threshold. The stuck cluster is all DEWA hold-point queries on Project Alpha. Suggest escalating as a single package rather than one-by-one.

0past 21-day mark
0
0-7d
0
7-14d
0
14-21d
0
21-28d
0
>28d
FIDIC 28-day threshold
Manpower heatmap
30d × 4 trades
مMu'tamad reads this as

Concrete crew peaked 8 days ago and is winding down. MEP ramping up — bring on the finishing trades next week. Excavation crew demob is complete. Today's mix is normal for week 26 of the programme.

412workers today
Excavation
Concrete
MEP
Finishing
30d agotoday
Live activity
0 events
    ConstructOps · Construction operationsSample data